Railway Accounts Department Examinations

Saturday, July 15, 2023

DFCCIL - OCC - Operations Control Centre

   


OCC - Operation Control Centre 


WDFC 


  • At Ahmedabad 

  • Operationalised in March 2023 

  • Controls entire WDFC’s Train operations, Signalling, and Power Supply and monitor the health of Rolling Stock & Track Safety. 

  • It is equipped with advanced technologies and new applications for Train operations. 

  • SCADA - Supervisory Control And Data Acquisition operations 

  • TPC - Traction Power Controller operations will be done from the OCC 

  •  Nerve-centre of WDFC - 1506 KMs - Double Track Electrified 2 x 25 KV From Mumbai JNPT (Jawaharlal Nehru Port Trust) to Dadri via Vadodara, Ahmedabad & Rewari, covering the States of Haryana, UP, Gujarat, Rajasthan, and Maharashtra. 

  • Green Building

  • Serve the Round-the-Clock 


EDFC

  • Going to be a launch 

  • OCC - for EDFC - Prayagraj, UP - World’s Second Largest OCC  

  • Command Centre for the entire route length of 1856 KMs of EDFC 

  • Green Building rating of GRIHA4 - equipped with Solar power and rainwater harvesting 

  • 1560 Sq Meter with a video wall of more than 90 metres. 

  •  The Divyang-friendly one 

  • Modern interiors, Best-in-class acoustics, ergonomically designed to suit the needs of the Traffic Controllers 

  • Integrated SCADA with TMS (Train Management System) - will enable the Traction Controllers to monitor, control as well as remotely operate power supply equipment at Traction Sub Stations, Sectioning and Parallelling posts for the Entire Network. 

  •  Under the Make in India or Atma Nirbhar initiative, the system has been developed by Alstom, and supported by their design teams in Bangalore. 

  • EDFC - 1875 KMs - Two distinct segments: 

  • Double Track - 1409 KMs - Dankuni to Khurja 

  • Single Track - 447 KMs - Khurja to Dadri   

              DFCCIL Network 


State

WDFC

EDFC

Total

% Share

UP

19

1078

1097

32

Rajasthan

567

-

567

16

Gujarat

565

-

565

16

Haryana

177

72

249

7

Bihar

-

239

239

7

West Bengal

-

203

203

7

Jharkhand

-

195

195

6

Maharashtra

178

-

178

6

Punjab

-

88

88

3

Total

1506

1875

3381

100

Key Points for MCQ  

  1. DFCCIL stands for Dedicated Freight Corridor Corporation of India Limited

  2. OCC stands for Operations Control Centre 

  3. OCC - WDFC - Ahmedabad

  4. OCC - EDFC - Prayagraj 

  5. OCC at Prayagraj - going to be launch - World’s Second Largest one

  6. OCC at Ahmedabad - Operationalised in March 2023 

  7. SCADA stands for Supervisory Control And Data Acquisition  

  8. DFCCIL - 3381 KMs

  9. WDFC - 1506 KMs 

  10. EDFC - 1875 KMs  

  11. UP covers - Highest Network of DFCCIL - 36 % 

  12.  DFCCIL - Incorporated - in 2006 -  as a Schedule A Company under the Companies Act, 1956 

******


Saturday, July 8, 2023

25% - Discount Fares - AC Sitting classes - Commercial

 

25% - Discount Fares - AC Sitting classes  

  • Source: Commercial Circular 11 of 2023  Click for the download  

  • CC 11 - applicable for the period of 1 year i.e., up to 06th July 2024

  • Applicable to: ACC - AC Chair Car, Executive classes of all Trains having sitting accommodation (not for AC sleeper berths) incl: Anubhuti & Vistadome coaches. 

  • Discount:  Up to a maximum of 25% on the Basic Fare only.   

  • Period of such Discount: Entire duration or part duration or specific period subject to a maximum of 6 months or weekends or seasons or weekdays etc. Based on the pattern of Demand

  • Implemented with immediate effect.  However, no refund of fare - for already booked tickets

  • Powers:  Delegated to PCCMs of all Zonal Railways 

  • PCCM stands for Principal Chief Commercial Manager (HAG - Higher Administrative Grade) 

  • Criteria for selecting Trains:  Classes with occupancy less than 50% (either end to end or some specified sections in the route) during the last 30 days 

  • Criteria for Quantum of Discount (maximum is 25%)  - Depends on the fares of the competitive modes of transport (Roadways, Airways, etc) 

  • Review of Discount fares: Regularly and based on occupancy, the discount may be modified/extended/withdrawn. 

  • If modified or withdrawn  - With immediate effect only. However, no difference in fare shall be charged or collected for already booked tickets 

  • If the Flexi fare scheme is in existing trains: 

  • 1st step:  withdraw the flexi fare scheme initially as a measure to increase occupancy. 

  • 2nd step: If occupancy is not improved, then the Discount scheme should be implemented in those classes/trains. 

  •  Discount Scheme not applicable to : 

  1. Special Trains (on account of the Festivals/holidays)

  2. PTOs - Privilege Ticket Orders 

  3. Difference of fare in Privilege Passes 

  4. Concessional vouchers 

  5. MLAs / Ex MLAs coupons 

  6. Warrants 

  7. MPs/Ex MPs 

  8. Freedom Fighters

  • If Discount Scheme is yes, Then No Tatkal Quota in those trains


Key points for MCQ:

  1. CC - Commercial Circular No 11 of 2023 

  2. CC 11 - Applicable for a period of one year (up to 6th July 2024) 

  3. Applicable to AC Sitting accommodation on all Trains 

  4. 25 % - Maximum Discount  

  5. Powers delegated to PCCMs 

  6. Less than 50% Occupancy - Criteria for Discount

  7. Not applicable for all concessions and Special Trains.  

  8. Powers delegated to PCCMs

—--end—---


Friday, July 7, 2023

GCC for Works 2022 April - Over view

 

GCC for Works, 2022 April  - An overview




·        GCC stands for General Conditions of Contracts for Works  

 

·        Latest edition:  2022 April Click for download 

 

·        115 pages

 

·        ACS - Advance Correction Slips   - So far issued Two 

 

·        Consists of Part I and Part II  

 

Part I - ITT -  Instructions To Tenderers: 

 

·        Total Clauses - 9 

 

·        Total Annexures - 8  

 

·        Total Pages - 40

 

·        Important ones are as follows: 

 

·        Clause 1.01 - Order of Precedence of Documents  

·        Clause 2  - Approved List of Contractors 

·        Clause 5 - Bid Security (old name is EMD) 

·        Clause 10 -Financial Eligibility Criteria, Technical Eligibility Criteria & Bid Capacity 

·        Clause 11 - Tenderer credentials

·        Clause 17 - Joint Ventures ( JV) in Works Tenders

Part II 

 

·        Consists of Standard General Conditions of Contract  

 

·        Total Paras 64  

 

·        Total Pages - 75

 

·        Important clauses are as follows:  

 

·        Para 1  - Definitions  

·        Paras 4 & 5 - Communications and Serving Notices

·        Para 7 - Assignment / Subletting of Contract 

·        Para 16 - SD - Security Deposit and PG - Performance Guarantee 

·        Para 17 A - Extension of Time - Not due by Contractor or Railways - Force Majeure Clause and Extension of Time due to Railways / or Due to Modification

·        Para 17 B - Extension of Time with LD - Liquidated Damages - due to Contractor. 

·        Para 17C - Bonus for Early Completion of Work

·        Para 42 - Variations in Contracts 

·        Para 45 - Measurements of Works by Railways as well as by Contractors 

·        Para 46 - On Account Payments 

·        Para 46 (4)  - Advances to Contractors 

·        Para 46 A - PVC - Price Variation Clause 

·        Para 51 - Final Payments

·        Para 61 & 62 - Determination of Contract 

·        Para 63 - Conciliation of Disputes 

·        Para 64 - Arbitration 

 

—end–