IT POWERS – RAILWAY BOARD

Authority: Railway Board letter No. 2006/C&IS/Oth./Delegation of Powers/36 (Original 10.12.2008 – amended up to Dec-2025)


1. PROCUREMENT OF PCs

AuthorityPower / Limit
GMNo limit on number of PCs
PHOD / DRM / CHOD / DG / Head of UnitMax 10 PCs per FY (additional account)
CTIsAs per delegated powers

Important figures & rules

  • Replacement → After codal life
    (RB letter 2022/AC-II/21 dated 24.03.2022)

  • Cost ceiling (RB Office)₹55,000 per PC
    (CPU + TFT Monitor)

  • Procurement modeGeM portal mandatory

  • Warranty → Minimum 3 years

  • Software → Licensed, separate copy per PC

  • Finance concurrence → Required


2. LOCAL AREA NETWORK (LAN) INFRASTRUCTURE

AuthorityPower
GMUp to ₹5 crore
DRM / othersNo powers under PH-17
  • Preferably secured wireless LAN

  • Charged as works under PH-17


3. IT APPLICATIONS (PRS / UTS / FOIS etc.)

ItemLimit / Rule
Sanctioning authorityGM
Financial limit₹5 crore
Plan HeadPH-17 (Computerization)
NetworkRailNet to be used
AccountalCapital
AuthorityRB letter 2014/F(X)II/10/6-Pt(1) dated 08.05.2024

4. AMC – HARDWARE & SOFTWARE

AuthorityPowers
GMFull Powers
PHOD / DRM / CHODFull Powers
SAG (Independent charge)Full Powers
  • AMC chargesRevenue

  • Warranty preference → 3 years

  • Finance concurrence → Required


5. PRINTERS & PERIPHERALS

  • Laser printers liberalized

  • Separate printer for every PCDiscouraged

  • Duplex printers preferred

  • Shared printers encouraged (esp. non-gazetted staff)


6. PURCHASE WITHOUT QUOTATION

RuleLimit
GFR 2017 – Rule 154₹50,000 per occasion
  • Requires certificate of:

    • Reasonable price

    • Required quality

    • Reliable supplier


7. RAILNET & SECURITY

  • All PCs → RailNet mandatory

  • Exception → Specific approval of GM / DRM

  • Security & cybersecurity compliance compulsory


8. PRS / UTS / FOIS – CRITICAL SYSTEMS

  • Treated at par with Railway traffic communication

  • 24×7 operation mandatory

  • Breakdowns → Highest urgency

  • Restoration through communication networks permitted


9. NOMINATED IT OFFICERS

JurisdictionOfficer
Zonal HQSr. EDPM
DivisionsSr. EDPM / DRM nominee
PUs / UnitsSr. EDPM / Unit nominee
PRS/UTS/NTES/PMSCCM/PM
FOIS/ICMS/CMS/COACFTM

10. FINANCE & ISSUE AUTHORITY

  • Issued with Finance Directorate concurrence

  • Digitally signed by Director ME (C&IS)

  • Date: 19-12-2025


ULTIMATE EXAM TAKEAWAY

  • GM = maximum IT powers
  • ₹5 crore (LAN & IT works)
  • ₹55,000 per PC
  • GeM mandatory
  • AMC = Full powers
  • ₹50,000 = GFR purchase without quotation

Sunday, September 17, 2023

Revised Estimates - GM Powers

 



Revised Estimates - GM Powers 



Source 1: Railway Board Letter 2023/F(X)-II/WP/2 dated 14.09.2023 - click here  


Source 2: Chapter 7 of Engineering Code 



When & How - RE - Revised Estimate is prepared - Para 708 E



  • As soon as it becomes apparent,

  • that the expenditure on a work is likely to exceed the amount (in Detailed Estimate) 

  • A RE - Revised Estimate is prepared & 

  • Submitted for sanction of the Competent Authority 

  • In the Same form & the same degree of detail (as the Original Estimate) 

  • Accompanied by a Comparative statement showing the excess or saving under each head of account.  




GM Powers - Sanction of Excess amount



Item

Price escalation

Other than 

Price escalation

Remarks

RE - Revised Estimate

Full powers 

Up to 20% of Original cost

MM - Material Modification - Up to Rs. 2.5 Crores in each case 

M&P Estimates

Up to 100% of Original Estimate or Rs.2 Crores whichever is less

Up to 20% of Original cost or Rs.50 Lakhs whichever is less

MM - Material Modification - Above Rs.10 Lakhs each - Personal approval of GM and Personal approval of PFA

Lump sum Works

Full powers 

Up to 20% of Original cost

Beyond permissible limits - Can sanction as long as the Revised cost is within the limit of powers of New Works under Lump sum category 


Throw forward works - subject to re-appropriation within the sanctioned allotment 

Survey Estimates

Up to 20% (if Original Estimate is sanctioned by Railway Board)

Subject to 


  1. Surveys are included in the Budget

  2. Followed approved yardsticks



Beyond GM Powers - Proposals sent to Railway Board - Check list as follows: 


  • Personal approval of GM 

  • Personal concurrence of PFA or PFA/C or FA&CAO/C

  • Complete details of Revision  

  • Variation Statement/MOD - Memorandum Of Differences 

  • Explanation 

  • Justification for increase/decrease in the scope of work and quantities 



Key points for MCQ : 


  1. Beyond GM powers - Required of Personal approval of GM & Personal concurrence of PFA or FA&CAO/C  

  2. MOD stands for Memorandum Of Differences 

  3. RE stands for Revised Estimate 

  4. DE stands for Detailed Estimates 

  5. MM stands for Material Modification

  6. Estimates - Chapter 7 of Engineering Code 

  7. GM Powers: 

  1. Revised Estimates - Price escalation - Full powers  

  2. Revised Estimates - Other than Price escalation - Up to 20% of Original Cost. 

  3. MM - Material Modification - Up to Rs. 2.5 Crores in each case  

  4. M&P estimates - Price escalation -  Up to 100% of Original Estimate or Rs.2 Crores whichever is less 

  5. M&P estimates - Otherthan Price escalation - Up to 20% of Original cost or Rs.50 Lakhs whichever is less 

  6. Lump sum works - Price escalation - Full powers 

  7. Lump sum works - Otherthan Price escalation - Up to 20% of Original Cost 

  8. Survey estimates - Up to 20% (if Original Estimate is sanctioned by Railway Board)