Railway Accounts Department Examinations

Thursday, June 9, 2022

DFC - Dedicated Freight Corridor Latest update on May 2022

 DFC - Dedicated Freight Corridor  



Latest update on May 2022


  • To be completed by June 2023 (90 % of DFC). That is 2750 RKM (Route Kilo Meters) of the Eastern DFC and Western DFC.  

  • The initial plan was to make both DFCs operational by June 2022-end, but the COVID-19 pandemic and subsequent slowing down of work at sites have resulted in the deadlines being pushed ahead.

 

  • Once completed, Coal, Food grain, and Export-Import Freight movement are expected to get a boost. 

 

  • Managing Director of DFCCIL - Shri Ravindra Kumar Jain 

 

  • Presently - 100 trains running on WDFC and 60 trains on EDFC.  Once completed the entire project, it may increase to 150 trains and 100 trains respectively.  

  

  • The biggest gain is that the freight movement from ports in Gujarat to New Delhi has been cut down by a day.  


  • EDFC  - 1875 RKM  From Ludhiana (Punjab) to Dankuni (West Bengal) covering Punjab, Haryana, UP, Bihar, and Jharkhand, West Bengal. 

 

  • WDFC - 1506 RKM.  From Dadri (UP) to Jawaharlal Nehru Port (Mumbai) covering UP, Haryana, Rajasthan, Gujarat, and Maharashtra. 

 

  • Average speed - EDFC - 65 km per hour

 

  • Average speed - WDFC - 41 km per hour 


  • Estimated Cost - 1,24,000 Crores. 

 

  • Cumulative CAPEX (up to 31.03.2022) - Rs. 89,342 Cr 




Key points for MCQ


  1. DFCCIL stands for Dedicated Freight Corridor Corporation of India Limited

  2. Western DFC - From Dadri (UP) to JN Port (Mumbai) 

  3. EDFC - From Ludhiana (Punjab) to Dankuni (West Bengal) 

  4. WDFC - 1506 RKM

  5. EDFC - 1875 RKM

  6. RKM stands for Route Kilo Meters 

  7. DFCCIL Hqrs - New Delhi

  8. Total Cost - Rs. 1,24,000 Crores 


******


Thursday, June 2, 2022

Project Utkrisht

 


Project Utkrisht


  •  Under this Project, IR is upgrading the passenger coaches of identified rakes with passenger-friendly amenities and modern features.


  • This Project is providing facilities for ICF type Coaches 


  • The first train under Project Utkrish is Kalka Mail (12311/12312) HWH-Howrah - KLK- Kalka on 02.10.2018 on the auspicious occasion of the 150th Birth Anniversary of Mahatma Gandhi.    

  

  • Initiated in 2018-19. 66 pairs of trains (140 rakes)  

 

  • Railways have plans to develop 640 Utkrisht rakes as part of the up-gradation of its mail/express trains in the next two years at a cost of Rs 400 crore.

 

  • The approximate cost is Rs. 60 Lakhs per Rake

 

  • Utkrisht R Rakes.  R stands for refurbished. 


  • Salient features of the Newly upgraded Rakes are as follows: 



  1. Vinyl wrapping of the doorway and gangway along with a big size mirror.  

  2. Provision of Fire extinguishers 

  3. Swachhata logo and stickers

  4. New color scheme

  5. Bottle holder, new ladders, GreenGo stickers 

  6. Ceiling fan in Non AC Sleeper coach painted with White color. 

  7. Braille signage and night glow stickers

  8. LED panel lighting in AC Coaches. 

  9. “Swachh Rail Toilet” (SRT) - A Hybrid Design Bio Toilet innovated by Indian Railway has been fitted in all coaches, giving an odorless experience.

  10. Big size mirrors and dustbins

  11. Stainless steel paneling - inside the pantry car

  12. New stainless steel utensils in the Pantry car

  13. USB charging points 

*****



Friday, May 27, 2022

Check List for creation of temporary posts / Work charged posts

 Check List for creation of  temporary posts / Work charged posts


  1. Prescribed Pro-forma.


  1. Justification (Purpose, quantity assessment, existing manpower, the present system of doing the same activity, checking the possibility of outsourcing the same, if it is economical) 


  1. Yardstick or norms 


  1. Administrative approval of PHOD.


  1. For Division operated posts, concurrence from Associate finance and administrative approval of DRM.


  1. Financial implications for the operation of posts for one year (Mean of Pay Cell 1 and Pay Cell 10 of 7th PC Matrix and % DA as on date. (for Temporary posts only) 


  1. Equivalent matching surrender.


  1. Existing manpower for the same activity 


  1. Routed through the Personnel branch. 


  1. Head of account / Classification of expenditure ( Revenue or Capital)

 

  1. Availability of funds under the above head of account. 

 

  1. Authority i.e., item of Model SOP - Schedule Of Powers 

 

  1. Sanctioning authority as per the above SOP item

 

  1. Mode of filling up the post 

 

  1. Any other relevant points 


In addition, the following checks are for Work charged posts



  1. Financial implications for the operation of posts for one year taking Mean Pay of Pay Cell 1 and Pay Cell 10 of 7th PC Matrix, % DA as on date, HRA, TA, DA on TA, 12% leave salary on Mean Pay and 4.17% gratuity on Mean Pay and DA thereon. 

 

  1. Showing availability of funds /provision in relevant works for creation duly vetted by Associate Finance.



******