WGR - Workshop General Register
Shri
Uday Kiran Bora, PS to PFA/SCR,
Mobile: 9242323381
·
A Workshop has number of shops viz.
Lathe, Assembly, Saw mill, Smithy etc.,
·
A work order is
an authority issued by Production Control Office to initiate any work in a
shop.
·
A work order will be enclosed with Route card (process of operations), material
required etc.
·
Job card
will move along with physical work, on which the timings of staff worked on
this work are noted.
·
Average Rate per hour = Total wages paid
(incl. Allowances)
§ Total no of hours worked in a month.
·
Necessity of Costing in
Workshops:
To know the output/outturn of any work and also to check whether the work is
financially viable or not.
Costs are divided into
|
Prime Costs
(Direct Costs)
|
On Costs
(Indirect costs)
|
·
Prime costs = direct labour costs +
direct material costs
·
Oncosts = indirect labour costs +
indirect material costs
·
Note: In workshops –
Oncosts and in Productions it is overhead charges.
Calculation of cost for a work:
Material used for all works in a shop
|
Labour for all works in a shop
|
1.
Stores from stores depot
|
1.
Total labour cost = total no. Of hours * average rate per hour
|
2.
Direct Purchases
|
2.
Incentive cost based on job card
|
3.
Received from other railways
|
3.
Misc. Costs
|
4.
Credits (Returned stores)
|
|
Total: Stores subledger
of the shop (1+2+3+4)
|
Total: Labour subledger of the shop (1+2+3)
|
All
shops added: Stores subledger of the workshop
|
All
shops added: Labour subledger of the workshop.
|
|
|
Workshop General Register
|
Out Turn Statement Part – I
|
Out Turn Statement Part – II
|
Outlay adjustable during the month
|
Outlay on works in progress & completed works – awaiting
acceptance by the concerned parties.
|
·
Parallelly Check
Sheet is prepared from the summary of the stores subledgers and
labour subledger to see that all the entries are entered in WGR.
·
Workshop General Register:
The totals of Stores subledger of the workshop and Labour subledger of the shop
are noted in a register, shop wise and work order wise, for a month is called
Workshop General Register.
·
Out Turn Statement: From
workshop general register, the Out Turn Statement Part- I and Out Turn
Statement Part-II are prepared. Out Turn Statement is prepared to check whether
it is booked to proper heads of account or not.
***